Before dispatch
Confirm the agreed packing list, dimensions, weights and delivery responsibilities with your supplier. Arrange unloading equipment suitable for the specified load and lifting instructions.
Prepare the route
Check entrance dimensions, floor capacity and the route to the installation position. Utilities and clearances must follow the selected machine documentation.
At arrival
Inspect packaging, record visible transport damage and check the contents against the agreed list. Coordinate commissioning with the supplier. This guide is not a record of a completed shipment.